Our Compex electricians recently carried out an installation at a new gas site near Guildford.
The control container was built in our workshops transported to site, where it was installed, wired, and commissioned onsite.
The project was delivered on time and on budget.
The site is now LIVE and producing 1MW of power into the grid.