Case Study - Bow Thruster Repair

Britannia Aggregates contacted us, requesting the repair of the Bow Thruster on the Britannia Beaver

We duly obliged and the project was a great success

Click here to download the 1 page pdf

Here's all the details:

Client: Britannia Aggregates

Client Website: www.brett.co.uk

Client Brief: To repair the Bow Thruster following a failure

Client Benefit: Vessel returned to an operational state very quickly

Scope of Work:

  • Dismantle and check all mechanical damage
  • Carry out an insulation, resistance and phase resistance test
  • Detail, strip, rewind and test Stator
  • Varnish, impregnate and stove
  • Clean and reassemble with new bearings
  • Run final checks and tests
  • Pole check
  • Fully assemble and paint, ready to return and re-install into vessel

Post Rewind:

  • Run insulation resistance test at 2400V
  • Run phase resistance test in Milliohms

Key Points:

  • Quick turnaround
  • Motor repaired successfully
  • Job completed on budget

Summary:

Getting the vessel back to a fully operational state as quickly as possible, was a priority, to alleviate unnecessary costs to our client. This objective was achieved so overall, the job was a complete success

Client Feedback: (Sean Collins)

This project (as with many before), was completed on time, on budget and we were very happy with the work completed by IME

Click here to download this case study

Contact Us

For further information please contact us here

amtech
elas
eplan
niceic
pruft
selco

PETROCHEM ● MARINE ENGINEERING ● SHIP REFIT & REPAIR ●  ON BOARD - INSITU REPAIRS ● ENGINEERING & FABRICATION ● ELECTRICAL  SERVICES ● HEAVY ENGINEERING ● THERMAL IMAGING ● INSPECT & TEST ● MOTOR REWINDS ● PAT TESTING ● PANEL DESIGN & BUILD ● PLC ALARM & DRIVE SYSTEMS ● THERMAL IMAGING ● EMF TESTING ●

I.M.E Group Limited, Burnley Wharf Marine Parade, Southampton, SO14 5JF (Company number 10740901)