T: 0044 (0) 2380 235205
E: info@ime-group.co.uk

IME are now proud to announce we have achieved ISO 14001 and ISO 45001 certification

Two and half years ago IME achieved ISO 9001.  We are now proud to announce we have achieved ISO 14001 and ISO 45001 certification, as part of our Quality Management System.

IME Group have actively engaged in a continuous performance improvement journey over the last two and half years.  Which started with addition of Engineering and Fabrication being added to the IME Group.

By participating, achieving and maintaining agreed criteria in quality, and sustainable improvement, plus achieving the ISO certification our customers can have confidence in IME ability to provide a service that is safe, reliable and of good quality.  This will allow IME to access new markets, with improved Safe, Health and Environmental performance, and more besides.  This will help hold or reduce cost, and satisfy our customer’s needs.

Going forward, as part of IME continuous improvement program, we are aiming to achieve ISO 27001, Information Security Management System (ISMS) before the end of 2019.  This will allow us to establish, operate, monitor and review information security for both IME and our customers and be fully complaint.

Installation of new dredge pump on Sand Heron by IME

 

IME carried out the removal of the existing motor and drive cabinets,  plus installation of the new drives, and manufacture of the motor bed plate.

IME then fitted the motor to the bed, laser aligned to the pump, and commissioned.

All of this work was completed within the timescale and on budget.

 

IME attending SMM exhibition in Hamburg 4-7th September 2018

IME are attending the SMM Maritime Trade Fair in September, which is the worlds number 1 show.

Anyone who is interested in the future of the maritime industry is going to attend the show.

If you are going to this, why not come along a visit us on the UK pavilion stand.

Compex installation at new gas site near Guildford

[smartslider3 slider=2]

Our Compex electricians recently carried out an installation at a new gas site near Guildford.

The control container was built in our workshops transported to site, where it was installed, wired, and commissioned onsite.

The project was delivered on time and on budget.

The site is now LIVE and producing 1MW of power into the grid.